top of page

![]() Therapy room | ![]() New waiting area |
---|---|
![]() Health Source - building frontSign replacement | ![]() Room addition in progress |
![]() Office wall addition | ![]() Remodel restroom |
![]() Remodel therapy room | ![]() New open area |
![]() New front office | ![]() New hall |
![]() Therapy room | ![]() New signage in office |
![]() Health Source - building frontSign replacment after. |
Health Source
This office began as three rooms. It was completely made over to suit the current tenant. Some walls were moved; others were added; and viewing windows were cut in some areas. The project required reworking electrical, reworking plumbing, painting, installing baseboards and signage, and removal and replacement of flooring.
![]() IMG_0993 | ![]() IMG_0992 |
---|---|
![]() IMG_0991 | ![]() IMG_0990 |
![]() IMG_0989 | ![]() IMG_0988 |
![]() IMG_0561 | ![]() IMG_0560 |
![]() 100_1621 | ![]() 100_1620 |
Broadway Academy of Arts
![]() Front of building completed | ![]() Side of building after update |
---|---|
![]() Side of building and front window after car accident repairs were made | ![]() Auto accident caused damage to the newly completed window |
![]() Side of building before update | ![]() Securing buildling before repairs |
![]() Making upgrade to windows | ![]() Insulating windows before siding |
![]() Damage to inside | ![]() After car was pulled away |
![]() After building was completed, auto crashed through the wall - no one was hurt! |
Hobart Food
![]() After facade improvements | ![]() Finished facade improvement |
---|---|
![]() Garage after improvements | ![]() Side of garage after window replacement & painting |
![]() Facade before improvements | ![]() Garage before improvements |
![]() Side of garage with window problems |
Wood Printing
![]() Lobby stairsProcess of stripping concrete | ![]() Lobby stairsProcess of stripping and cleaning concrete. |
---|---|
![]() Laying new flooring in walkway | ![]() Laying new flooring |
![]() New flooring on landing | ![]() AfterNew flooring on walking and landing and non-slip stair treads |
![]() New flooring on walking | ![]() Stairs after |
![]() Non-slip stair treads | ![]() New flooring on landing |
![]() Non-slip stair treads |
Kendrick Place HOA Lobby
The stairs, landing and walking was completely redone. The concrete was stripped, cleaned with new flooring replacement and non-slip stair treads. Also, new flooring on landing and walkway.
bottom of page