top of page
Therapy room

Therapy room

New waiting area

New waiting area

Health Source - building front

Health Source - building front

Sign replacement

Room addition in progress

Room addition in progress

Office wall addition

Office wall addition

Remodel restroom

Remodel restroom

Remodel therapy room

Remodel therapy room

New open area

New open area

New front office

New front office

New hall

New hall

Therapy room

Therapy room

New signage in office

New signage in office

Health Source - building front

Health Source - building front

Sign replacment after.

Health Source

 

This office began as three rooms. It was completely made over to suit the current tenant.  Some walls were moved; others were added; and viewing windows were cut in some areas.  The project required reworking electrical, reworking plumbing, painting, installing baseboards and signage, and removal and replacement of flooring.

IMG_0993

IMG_0993

IMG_0992

IMG_0992

IMG_0991

IMG_0991

IMG_0990

IMG_0990

IMG_0989

IMG_0989

IMG_0988

IMG_0988

IMG_0561

IMG_0561

IMG_0560

IMG_0560

100_1621

100_1621

100_1620

100_1620

Broadway Academy of Arts

Front of building completed

Front of building completed

Side of building after update

Side of building after update

Side of building and front window after car accident repairs were made

Side of building and front window after car accident repairs were made

Auto accident caused damage to the newly completed window

Auto accident caused damage to the newly completed window

Side of building before update

Side of building before update

Securing buildling before repairs

Securing buildling before repairs

Making upgrade to windows

Making upgrade to windows

Insulating windows before siding

Insulating windows before siding

Damage to inside

Damage to inside

After car was pulled away

After car was pulled away

After building was completed, auto crashed through the wall - no one was hurt!

After building was completed, auto crashed through the wall - no one was hurt!

Hobart Food

After facade improvements

After facade improvements

Finished facade improvement

Finished facade improvement

Garage after improvements

Garage after improvements

Side of garage after window replacement & painting

Side of garage after window replacement & painting

Facade before improvements

Facade before improvements

Garage before improvements

Garage before improvements

Side of garage with window problems

Side of garage with window problems

Wood Printing

Lobby stairs

Lobby stairs

Process of stripping concrete

Lobby stairs

Lobby stairs

Process of stripping and cleaning concrete.

Laying new flooring in walkway

Laying new flooring in walkway

Laying new flooring

Laying new flooring

New flooring on landing

New flooring on landing

After

After

New flooring on walking and landing and non-slip stair treads

New flooring on walking

New flooring on walking

Stairs after

Stairs after

Non-slip stair treads

Non-slip stair treads

New flooring on landing

New flooring on landing

Non-slip stair treads

Non-slip stair treads

Kendrick Place HOA Lobby

 

The stairs, landing and walking was completely redone. The concrete was stripped, cleaned with new flooring replacement and non-slip stair treads. Also, new flooring on landing and walkway.

bottom of page